B2B Clean Space B2B Clean Space Commercial cleaning Discuss your site
Home · Industries · Galleries and exhibition spaces

Cleaning for art spaces and exhibitions

How cleaning works in a gallery and an exhibition hall

Cleaning around the artworks without touching them, white walls and plinths left unmarked, vitrine glass without fingerprints and a night shift after the opening — built around how an exhibition space in Dubai actually lives: installs, changes of exhibition and evening events.

An international company, founded in 2006
Who we are and why an exhibition hall is its own job

Cleaning that protects
the exhibition

We look after galleries, exhibition halls, art spaces, design showrooms and fair venues — from a single room to a complex with a workshop and storage.

A generalist cleaning contractor turns up with an office routine: mops the whole floor, sprays chemicals next to the works and wipes the plinth along with the label. One pass like that costs more than a year’s contract.

Who we look after among venues
Galleries and art spaces Exhibition halls and pavilions Corporate and private collections Design and furniture showrooms Fair and biennale venues

Why an exhibition hall
can’t run on an office protocol

Four reasons. Pick one and see what it means for the contractor.

The work must not be touched

Cleaning happens around the works at an agreed distance: no contact, no leaning on a plinth, no spraying towards the exhibition. The distance and the access rules are set by the curator, not by the cleaner.

What follows from this

The distance to the works and the rules for entering the halls are agreed with the curator and written into the site plan.

White shows everything

White walls, plinths and a resin floor are the main surface of the hall. A fingerprint, dust or a mop mark shows from three metres away, so the work is done with microfibre and the product goes onto the cloth, never sprayed.

What follows from this

The product goes onto the cloth, never sprayed: aerosols near the exhibition are not allowed.

An install calendar, not a working day

A hall doesn’t have shifts but phases: install, opening, exhibition, de-install. After a de-install there’s construction dust and fixings; before an opening there’s a spotless hall to produce in one night.

What follows from this

After a de-install the hall is signed off separately: construction dust is cleared before the new exhibition arrives.

Events finish late

After an opening there are glasses, marks on the floor and rubbish, and in the morning the hall opens to visitors. The work happens at night, in a tight window, with a crew rather than one person.

What follows from this

The full pass happens before opening or at night; while visitors are in, an attendant covers the touchpoints.

Scope of work

What we do in the halls

01 Entrance and box office Door glass, the desk, the terminal, the mat and hand marks at contact height — before opening and through the day.
02 Exhibition halls Floor by covering type, skirting and corners, a set route that never enters the exhibit zone.
03 White walls and plinths Dry wiping with microfibre, shoe marks on the base and fingerprints at hand height. Labels and captions are left alone.
04 Vitrines and glass Vitrine and frame glass inside and out within reach, profiles and stands — product on the cloth, no aerosol near the works.
05 Touchpoints Handles, buttons, handrails, audio-guide stands and tablets — on every round.
06 Washrooms Cleaned with disinfectants, consumables, odour control, dedicated equipment for the sanitary area.
07 Event space and lecture room Set out to the venue plan, cleaned between sessions, glasses and rubbish removed after the event.
08 Workshop and unpacking area Packaging, shavings and dust after an install — so none of it reaches the halls on people’s shoes.
09 Waste Segregated collection, cardboard and packaging taken to the yard, containers washed.
10 Consumables Soap, sanitiser, paper, gloves for the install crew — restocked against the checklist.
01 Deep clean between exhibitions While the hall is empty: high level, light fittings, grilles, walls in full and the floor under the plinths.
02 Cleaning after a de-install Construction dust, fixing marks and leftover packaging — before the new exhibition arrives.
03 Glazing cleaning Vitrine and facade glazing inside and out, high-level sections under permit.
04 Night shift after an event Glasses, marks on the floor and rubbish — the hall is back to exhibition condition by morning.
Key risk areas

The areas we
answer for

Tap an area on the plan to see where the risk sits and what we do about it.

1

Entrance and box office

Why the risk is here

The first thing a visitor sees, and the most visible glass on the site.

What we do

Several rounds a day: glass, desk, terminal, mat, touchpoints.

3–4×/day frequency glass and touchpoints what we work with
2

Exhibition halls

Why the risk is here

The main area, and the one where a mistake costs the most.

What we do

Floor along the route without entering the exhibit zone, skirting and corners, base dry wiped.

daily frequency route clear of the works what we work with
3

Vitrines and plinths

Why the risk is here

Glass and white surfaces at hand height — fingerprints show immediately.

What we do

Microfibre and product on the cloth, never sprayed. Distance to the works per the access plan.

daily frequency product on the cloth what we work with
4

Event space

Why the risk is here

After an opening the hall has to open in the morning in exhibition condition.

What we do

Night shift: glasses taken out, marks on the floor, rubbish, set out to the venue plan.

after the event frequency night shift what we work with
5

Workshop and storage

Why the risk is here

This is where things are unpacked and assembled — the source of dust and packaging for the whole hall.

What we do

Cleaned after every install, packaging removed, dusting without moving any crates.

after an install frequency packaging removed what we work with
6

Washrooms and cloakroom

Why the risk is here

On opening days the footfall is several times the usual.

What we do

Treated several times a day, dedicated equipment, consumables restocked, signed off on the checklist.

3–4×/day frequency dedicated equipment what we work with
Quality, KPIs and how we work

Measured on site,
reported to you

The KPI and SLA framework is set for your site at launch, so quality can be checked rather than taken on trust.

What we measure
Hall ready at opening against the checklist
Zero contacts with works or plinths during a shift
State of the vitrine glass on a spot check
Time to return the hall to exhibition condition after an event
Consumables present in the washrooms and cloakroom
Number of points raised by the curator at inspection
How the work runs on site
1 A dedicated crew and a supervisor who signs each shift off on site.
2 A checklist by hall and an access plan, agreed with the curator before work starts.
3 A photo report within 60 minutes of the shift ending.
4 Scheduled and unannounced quality inspections twice a month.
5 A monthly SLA report with every issue reviewed and a plan for the next period.

What the client
facilities teams

Four things facilities teams answer for in front of their own management — and that we take on.

One person accountable

A site manager and a supervisor by name and direct number, not a general office line.

The floor is ready at opening

Glass, floors and plinths are signed off before the first visitor, not finished off around them.

The exhibition comes to no harm

Distance to the works, the ban on aerosols near them and the access rules are written into the site plan.

Our own equipment and chemicals

Microfibre by area, products without aggressive solvents and safety data sheets sit with the contractor.

Who we’ve worked with

You don’t notice the right contractor while things go well — and they prove their worth the moment something goes wrong.

Gallery Showroom Art space Pavilion Design showroom Art fair Biennale Corporate collection Lecture room Workshop Collection storage Open-air exhibition
Budget estimate

How many people
and hours a hall needs

Set the area and the schedule — you get the crew size, hours on site and a price range. The exact figure comes after the survey.

Area of the halls
Operating pattern

A day attendant is a cleaner who works during visitor hours: vitrine and door glass, touchpoints, shoe marks on the base, rubbish in the seating areas. They work spot by spot, with no buckets in the walkways and no wet floor underfoot.

Site type
Site quote
Operating pattern
What makes the site different
Output per cleaner
Hourly rate per cleaner
Man-hours per month
Monthly price range, materials excluded
Send the estimate to WhatsApp
Neighbour rate If we already have sites nearby, the crew runs one route — and your rate comes in below the base one. Offer terms →
Terms and launch

Clear terms,
a straightforward start a straightforward start

Tap a stage to see what happens on site and what you get at the end of it.

days 1–2

Survey

A walk of the halls with the curator, areas measured, an access plan with distances to the works.

What you get at this step
A walk of the halls together with the curator
Areas measured and an access plan drawn up
An access window agreed around the install calendar
up to 5 days

Quote

Method statement by hall, a schedule fitted to the install and event calendar, and the price.

What you get at this step
Method statement by hall and frequency
Crew size and shift schedule
A price broken down by task
days 7–10

Launch

Crew briefed on the venue’s rules, equipment delivered, an initial deep clean.

What you get at this step
A crew briefed on the venue’s rules
Equipment and cleaning products on site
Deep clean before the contract starts
weeks 3–4

Full operation

First quality inspection, checklist and access plan adjusted, SLA report.

What you get at this step
First quality inspection report
Access plan adjusted
Monthly SLA performance report
Contract terms
Minimum contract term 12 months
Work schedule before opening, at night, between exhibitions
Pay monthly, based on work completed
Equipment and chemicals ours, included in the price
Staff replacement within 4 hours
Reporting per shift and per month

Tell us
about the site

Send us the area and the shift pattern — we’ll arrange a survey and have your quote ready within five working days.

Contacts Dubai · UAE
Office
38 Street 11, Al Barsha First
Al Barsha, Dubai, UAE