In Dubai the grounds are defined by sand: it arrives on the wind and settles on the entrance, the car park and the pavements overnight. So the shift is early — the building meets its first arrivals clean, and the crew finishes before the heat.

early morning
before the building opens and before the heat
to schedule
the grounds are kept clean continuously, not as a one-off
8 blocks
in the scope of work
on a signed report
walk-round and photographs by area

What’s included
the service includes

Eight blocks of the method statement. Hover over a block for the tasks and how often they’re done. The list of areas and where responsibility ends are agreed at the survey together with the property manager.

01 Entrance area daily
02 Car park and access roads to a schedule
03 Pavements and pedestrian areas daily
04 Waste and the collection area daily
05 Street furniture and fittings to a schedule
06 Plinth and lower facade to a schedule
07 Drainage and gratings to a schedule
08 Walk-round and sign-off every shift
Block 01 of 08 · daily

Entrance area

Steps, ramp and the forecourt
Barrier matting and gratings
Door glass and handrails outside
The bin by the door and the smoking area

The boundaries of the grounds are fixed on a plan before work starts: where your area ends and the city’s begins is a question best settled up front, not at the first complaint.

Block 02 of 08 · to a schedule

Car park and access roads

Sweeping the roadways and parking bays
Oil stains on tarmac and in the basement car park
Line markings, barriers and wheel stops
Cleaning by sector, so cars are never blocked in

The boundaries of the grounds are fixed on a plan before work starts: where your area ends and the city’s begins is a question best settled up front, not at the first complaint.

Block 03 of 08 · daily

Pavements and pedestrian areas

Sweeping and collecting sand after the wind
Pressure washing to a schedule
Paving joints, kerbs and tree pits
Chewing gum and ingrained stains

The boundaries of the grounds are fixed on a plan before work starts: where your area ends and the city’s begins is a question best settled up front, not at the first complaint.

Block 04 of 08 · daily

Waste and the collection area

Bins: emptied, washed, liners replaced
Container yard: swept and washed
Overflow checked during the day
Waste streams kept separate where the site does so

The boundaries of the grounds are fixed on a plan before work starts: where your area ends and the city’s begins is a question best settled up front, not at the first complaint.

Block 05 of 08 · to a schedule

Street furniture and fittings

Benches, tables and parasols
Railings, bollards and signage boards
Bike racks and charging points
Planters and outdoor pots

The boundaries of the grounds are fixed on a plan before work starts: where your area ends and the city’s begins is a question best settled up front, not at the first complaint.

Block 06 of 08 · to a schedule

Plinth and lower facade

Plinth and cladding washed up to reachable height
Marks from water, sand and vehicles
External grilles and ventilation housings
Service entrance doors

The boundaries of the grounds are fixed on a plan before work starts: where your area ends and the city’s begins is a question best settled up front, not at the first complaint.

Block 07 of 08 · to a schedule

Drainage and gratings

Gratings cleared of sand and leaves
Sumps and drainage channels
Checked before the rainy season
Blockages needing repair recorded

The boundaries of the grounds are fixed on a plan before work starts: where your area ends and the city’s begins is a question best settled up front, not at the first complaint.

Block 08 of 08 · every shift

Walk-round and sign-off

Walk-round following the site plan
Photographs by area after the shift
Damage and abandoned items recorded
Shift work order and a monthly report

The boundaries of the grounds are fixed on a plan before work starts: where your area ends and the city’s begins is a question best settled up front, not at the first complaint.

Which sites

The service is for buildings with their own grounds, judged on them before anyone gets inside.

Business centres The entrance done before the tenants arrive
Malls and retail Car park by sector, and the trolleys
Hotels and restaurants Terraces and the entrance area before opening
Residential buildings Play areas and seating areas
Warehouses and logistics parks Access roads, loading docks and the container yard
Clinics and medical centres The entrance and patient parking

Shift work order

This is what the shift work order looks like after the morning walk-round: the areas, the times and what was recorded. A sample follows.

Site
Business centre, 2,100 m² of grounds · sample
Shift
Morning · 05:30–08:30
Crew
6 cleaners + supervisor
Weather
Wind overnight
Done 6 / 6
Entrance area steps, ramp, barrier matting, door glass Main entrance daily 05:40
Sand after the wind blower through corners and joints, then sweeping Pavements, forecourt unscheduled 06:10
Car park by sector roadways and bays swept, sectors A and B Open car park to schedule 06:50
Bins and containers emptied, washed, liners replaced Outdoor areas and grounds daily 07:40
Pressure washing paving by the entrance and the container yard, area barriered off Entrance area to schedule 08:00
Walk-round and photo report walk following the plan, photographs by area, issues recorded Outdoor areas and grounds every shift 08:20
Shift closed
Site handed over open and clean by 08:30
Photographs by area — attached to the walk-round sheet
Request a scope of work →

How it works

From enquiry to the first shift — three to seven working days.

01 days 1–2
Survey of the grounds

We walk the grounds and record the areas, the surfaces and the water points. Responsibility boundaries are agreed with the property manager.

02 up to 3 days
Method statement and schedule

A site plan with the areas marked, the frequency for each, shift times, crew size and a fixed price.

03 from week 1
Shifts start

Early shifts to the schedule. The supervisor works the first few days to settle the route and the time each area takes.

04 monthly
Report and adjustment

The month’s walk-round sheets, photographs by area, a review of anything raised, and the schedule adjusted for the season.

Control
and oversight

Four mechanisms that make quality something you can check, not something we claim.

Site plan Area and responsibility boundaries agreed before work starts — an appendix to the contract, with the plan.
The order after wind Blower and sweeping first, water only after. Start with washing and the sand gets spread across the site.
Working by sector Car parks and roadways are cleaned section by section: no need to close a whole level or move cars out.
Shift work order Every shift is closed with a walk-round following the plan, photographs by area and a record of any damage.

Price
estimate

Set the area of the grounds and the type of zone — a price range, crew size and duration appear on the right. The exact figure is worked out after the survey.

Start with the area
Step 1 · area of the grounds, m²
Step 2 · type of zone
Step 3 · additional work
Total · estimate per visit
Duration
Crew size
Check the estimate with a manager
Annual contract A twelve-month contract gives a lower rate than monthly terms and locks the price for the full term. Offer terms →

Terms and equipment

What the contract fixes and what the crew brings to site.

Contract terms
Type of work contract to a schedule
Shift times early, before opening
Boundaries of the grounds per the plan agreed at the survey
Equipment and machinery ours, included
Water and power points on site, as agreed
Waste removal to the site’s collection point
Reporting shift work order and photographs
Launch in 3–7 days
We supply all equipment and cleaning products
Sweeper machines Roadways, car parks and long pavements: mechanical sweeping instead of brooms over a large area.
Pressure washers Paving, plinth, the container yard and ingrained stains. Water use is kept under control.
Blowers Sand out of corners, tree pits and paving joints — where a broom only smears it.
Outdoor equipment Outdoor brooms, shovels, trolleys and sacks. Equipment for the grounds never crosses over with the indoor set.
Signage and barriers The washing area is closed off: wet paving on a walkway is an injury waiting to happen.
Sun protection Hats, water and a schedule with breaks: the work is planned for the early hours.
Safety data sheets for every product, on request

Frequently asked questions

Tap a question to open the answer.

The entrance and pavements — daily: sand settles overnight and the building greets people already dirty. Car parks and roadways — to a schedule, usually a few times a week. After strong wind an extra pass is needed: we write that into the contract so it doesn’t have to be agreed from scratch each time.

The sand is first blown out of corners, paving joints and tree pits, then swept up, and only after that does washing make sense. Start with water and the sand turns to mud and gets spread across the whole site.

Yes, by sector. The car park is split into sections and each is cleaned at its own time, so a whole level never has to be closed. The schedule is agreed with the property manager, and the section being cleaned is marked with signs.

We collect it and take it to the site’s collection point — the container yard. Removal off site is done by a licensed operator under contract with the property manager; we can help arrange that if needed.

Shifts are planned for the early hours, before the peak. It isn’t only about the crew: water on hot paving dries before it can do its job and leaves streaks. The summer schedule is agreed separately and usually moves earlier still.

Landscaping and irrigation, repairs to surfaces and markings, waste removal off site, drainage cleaning below the gratings, and high-access work on the facade. All of it is priced separately and agreed in advance.