Post-construction cleaning

What the service includes, what it costs and how to start

Construction dust keeps settling for several days, so the site isn’t cleaned once but in three stages: a rough clean with the debris taken out, a finish clean once the dust has settled, and a check pass before handover. The site is handed over on a signed record with photographs of every area.

3 stages
rough, finish and a check before handover
2 passes
for the dust — it settles again after the first clean
8 areas
in the method statement
on a signed report
handover on site with photographs

What’s included
the service includes

Eight areas of the method statement. In each line, the left side is what the rough clean does, the right side after the arrow is what the finish clean does. The final list is fixed as an appendix to the contract after the survey.

01 High level rough → finish
02 Walls and verticals rough → finish
03 Windows and glazing rough → finish
04 Furniture rough → finish
05 Floors and coverings rough → finish
06 Washrooms and wet areas rough → finish
07 Kitchens and food areas rough → finish · per site specification
08 Waste and removal rough → finish
Block 01 of 08 · rough → finish

High level

Ceiling: dry dust removal, mortar splashes → damp wipe, fine dust and streaks
Light fittings and pendants: film removed, dusted → diffusers washed, installation dust
Vent grilles: construction dust removed → damp wipe
Tops of cabinets and everything above 1.8 m: dust and debris → damp wipe for settled dust
Cornices and beams: runs and dust → damp wipe

The finish stage starts no sooner than a day after the rough one: the dust has to settle, or it will have to be cleaned a third time.

Block 02 of 08 · rough → finish

Walls and verticals

Walls, sockets, cable trunking, radiators: mortar splashes, paint, stickers → wiped free of dust and streaks
Doors, frames, architraves: film removed, foam and mortar → washed, adhesive residue from the film
Touchpoints — handles, buttons, handrails: construction soiling → wiped with disinfectant

The finish stage starts no sooner than a day after the rough one: the dust has to settle, or it will have to be cleaned a third time.

Block 03 of 08 · rough → finish

Windows and glazing

Windows and glazing inside: film removed, paint and mortar off the glass → washed, streaks and adhesive residue
Glass partitions: rough clean → washed and polished on both sides
Blinds and shutters: construction dust removed → damp wipe

The finish stage starts no sooner than a day after the rough one: the dust has to settle, or it will have to be cleaned a third time.

Block 04 of 08 · rough → finish

Furniture

Cabinets outside: construction dust and film → wiped for settled dust
Cabinets inside, shelves and recesses: dust removed from recesses → shelves damp wiped
Soft furniture: usually sheeted, dusted as needed → vacuumed, dust off the upholstery
Desks, shelves, racking: dust and stickers → damp wipe
Equipment on the furniture: usually sheeted, dusted → wiped free of construction dust

The finish stage starts no sooner than a day after the rough one: the dust has to settle, or it will have to be cleaned a third time.

Block 05 of 08 · rough → finish

Floors and coverings

Hard floors and skirting: mortar, paint, debris, rough wash → finish wash, streaks and stains
Carpet and soft coverings: usually sheeted, construction dust vacuumed → vacuumed, fine dust

The finish stage starts no sooner than a day after the rough one: the dust has to settle, or it will have to be cleaned a third time.

Block 06 of 08 · rough → finish

Washrooms and wet areas

Sanitary ware: mortar, stickers, protective film → washed with disinfectant, dust and streaks
Taps and fittings: film and mortar splashes → polished, dust and streaks
Mirrors: film removed, paint and mortar → washed and polished, streaks
Wall and floor tiling: grout, mortar, film → washed, cement haze
Dispensers: left alone on the rough clean → damp wipe

The finish stage starts no sooner than a day after the rough one: the dust has to settle, or it will have to be cleaned a third time.

Block 07 of 08 · rough → finish · per site specification

Kitchens and food areas

Work surfaces and sink: mortar and protective film → washed, construction dust and streaks
Appliances outside: film removed, construction dust → fronts washed, dust
Appliances inside: left alone on the rough clean → optional: cleaned inside
Kitchen unit fronts: film removed, mortar → washed free of dust
Extraction hood: construction dust off the housing → housing washed, filters as a separate option

The finish stage starts no sooner than a day after the rough one: the dust has to settle, or it will have to be cleaned a third time.

Block 08 of 08 · rough → finish

Waste and removal

Bins: construction debris taken out, emptied → emptied and washed
Waste removal: construction offcuts, packaging, films → residual debris and packaging
The removal route is agreed with the property manager
The removal route is cleaned after every run

The finish stage starts no sooner than a day after the rough one: the dust has to settle, or it will have to be cleaned a third time.

Which sites

The service is for sites where the works are finished and the space has to be handed over for acceptance.

Offices after fit-out Handed over for acceptance by the tenant or owner
Retail and showrooms before opening Display windows and fixtures before the merchandise goes in
Restaurants and cafés before launch Kitchen and food areas before produce is delivered
Clinics after refitting Consulting rooms and corridors before the equipment is installed
Residential buildings: lobbies and common areas Lobbies and entrances before occupation
Warehouses and production after installation Racking and loading docks before goods start arriving

Handover report record

This is what the acceptance record looks like after construction cleaning. It is filled in on site together with your representative, with photographs of every area attached. A sample follows.

Site
Office after fit-out, 900 m² · sample
Stages
Rough, finish, check
Crew
6 cleaners + supervisor
Pause
A day for the dust to settle
Done 6 / 6
Debris removed offcuts, packaging, rags — along the agreed route All areas rough day 1
Dust extraction construction vacuum top to bottom, walls and ceilings All areas rough day 1
Films and stickers removed from glazing, frames and doors, adhesive residue Glazing, doors finish day 2
Marks from materials paint, filler, foam, cement haze All areas finish day 2
Floors and washrooms washed in several passes, grout and sanitary ware All areas finish day 2
Check and handover checked for residual dust, record signed, photographs by area The whole site check day 3
Work accepted
Handover on site with the client’s representative
Photographs of every area — attached to the record
Request a scope of work →

How it works

From enquiry to the crew on site — two to five working days.

01 days 1–2
Site survey

We look at what has been left behind, the state of the coverings and the removal routes, and record which works are still running and what must not be touched.

02 up to 2 days
Scope and quote

Method statement by area broken into stages, crew size, list of equipment and a fixed price.

03 to the construction programme
Rough stage

Debris removed and the first dust extraction. Done straight after the works finish so the site can be inspected.

04 a day later
Finish and handover

Finish cleaning once the dust has settled, a check pass, the acceptance record and photographs of every area.

Control
and oversight

Four mechanisms that make quality something you can check, not something we claim.

Method statement by area The task, the stage and the method for each area — fixed as an appendix to the contract after the survey.
A pause for the dust to settle The finish stage comes no sooner than a day after the rough one. Otherwise the site is handed over clean and is dusty again by morning.
Handover on site A walk-round with your representative against the method statement. Anything raised is put right before the record is signed.
Photo report by area Photographs of every area are attached to the record — you see the condition before and after, not a general impression.

Price
estimate

Set the area and the state of the site — a price range, crew size and duration appear on the right. The exact figure is worked out after the survey.

Start with the area
Step 1 · site area, m²
Step 2 · state of the site
Step 3 · additional work
Total · estimate per visit
Duration
Crew size
Check the estimate with a manager
First clean at a discount A clean before the regular cycle starts — 10% off when you sign the contract. Offer terms →

Terms and equipment

What the contract fixes and what the crew brings to site.

Contract terms
Type of work one-off project
Stages rough, finish, check
Working hours to the construction programme
Equipment and chemicals ours, included
Waste removal to the site’s collection point
Sign-off signed on site
Reporting photographs of every area
Crew mobilisation in 2–5 days
We supply all equipment and cleaning products
Construction vacuums Class M and H to suit the dust, with fine filters and continuous extraction.
Rotary machines Floors washed in several passes and cement haze lifted off the covering.
Scrapers and spatulas Films, stickers and splashes of material removed without scratching glass or frames.
Solvents by type of mark Separate products for adhesive, paint, cement and expanding foam. Safety data sheets kept on site.
Telescopic equipment Upper walls, ceilings and light fittings — without ladders or extra downtime.
Protective equipment Respirators, goggles and gloves — a site after construction counts as a high-dust environment.
Safety data sheets for every product, on request

Frequently asked questions

Tap a question to open the answer.

In what has to come off and in the order of work. After construction it’s dust, paint, adhesive, filler and cement, plus removing protective films — none of that is in a deep clean. And it’s done in three stages with a pause, because the dust doesn’t settle straight away. A deep clean works on a clean site and in one pass.

Fine construction dust stays in the air and settles over the day after the works finish. Clean the site in one pass and by morning the surfaces are dusty again. That’s why the finish stage starts no sooner than a day after the rough one, with a check pass before handover.

We collect leftover materials, packaging and rags and take them to an agreed point. Skip removal is a separate service, agreed in advance with the building’s property manager: it needs a permit, a route and a time slot.

Yes, if the works are in other rooms. The site is then split into sections and the cleaned areas are closed off so they don’t get dirty again. If fit-out continues in the same area, the rough stage waits until it finishes — otherwise the work gets done twice.

We are. Before starting we record the condition of the finishes, we use products matched to the specific material, and liability is covered by insurance. Delicate surfaces — fresh lacquer, soft stone, painted panels — are tested on a inconspicuous area and the method is agreed with you.

Strip-out, putting right construction defects, skip removal, industrial duct cleaning and high-access facade work. All of it is priced separately and agreed in advance.

Let us price your site

Send us the area, the state of the site and the date the works finish — we’ll come back with a method statement and a quotation. The survey is free.