Post-construction cleaning
What the service includes, what it costs and how to start
Construction dust keeps settling for several days, so the site isn’t cleaned once but in three stages: a rough clean with the debris taken out, a finish clean once the dust has settled, and a check pass before handover. The site is handed over on a signed record with photographs of every area.
What’s included
the service includes
Eight areas of the method statement. In each line, the left side is what the rough clean does, the right side after the arrow is what the finish clean does. The final list is fixed as an appendix to the contract after the survey.
High level
The finish stage starts no sooner than a day after the rough one: the dust has to settle, or it will have to be cleaned a third time.
Walls and verticals
The finish stage starts no sooner than a day after the rough one: the dust has to settle, or it will have to be cleaned a third time.
Windows and glazing
The finish stage starts no sooner than a day after the rough one: the dust has to settle, or it will have to be cleaned a third time.
Furniture
The finish stage starts no sooner than a day after the rough one: the dust has to settle, or it will have to be cleaned a third time.
Floors and coverings
The finish stage starts no sooner than a day after the rough one: the dust has to settle, or it will have to be cleaned a third time.
Washrooms and wet areas
The finish stage starts no sooner than a day after the rough one: the dust has to settle, or it will have to be cleaned a third time.
Kitchens and food areas
The finish stage starts no sooner than a day after the rough one: the dust has to settle, or it will have to be cleaned a third time.
Waste and removal
The finish stage starts no sooner than a day after the rough one: the dust has to settle, or it will have to be cleaned a third time.
Which sites
The service is for sites where the works are finished and the space has to be handed over for acceptance.
Handover report record
This is what the acceptance record looks like after construction cleaning. It is filled in on site together with your representative, with photographs of every area attached. A sample follows.
Office after fit-out, 900 m² · sample Stages
Rough, finish, check Crew
6 cleaners + supervisor Pause
A day for the dust to settle
Photographs of every area — attached to the record
How it works
From enquiry to the crew on site — two to five working days.
We look at what has been left behind, the state of the coverings and the removal routes, and record which works are still running and what must not be touched.
Method statement by area broken into stages, crew size, list of equipment and a fixed price.
Debris removed and the first dust extraction. Done straight after the works finish so the site can be inspected.
Finish cleaning once the dust has settled, a check pass, the acceptance record and photographs of every area.
Control
and oversight
Four mechanisms that make quality something you can check, not something we claim.
Price
estimate
Set the area and the state of the site — a price range, crew size and duration appear on the right. The exact figure is worked out after the survey.
Terms and equipment
What the contract fixes and what the crew brings to site.
Related services
Some of this can be ordered separately or written into the site scope.
Frequently asked questions
Tap a question to open the answer.
In what has to come off and in the order of work. After construction it’s dust, paint, adhesive, filler and cement, plus removing protective films — none of that is in a deep clean. And it’s done in three stages with a pause, because the dust doesn’t settle straight away. A deep clean works on a clean site and in one pass.
Fine construction dust stays in the air and settles over the day after the works finish. Clean the site in one pass and by morning the surfaces are dusty again. That’s why the finish stage starts no sooner than a day after the rough one, with a check pass before handover.
We collect leftover materials, packaging and rags and take them to an agreed point. Skip removal is a separate service, agreed in advance with the building’s property manager: it needs a permit, a route and a time slot.
Yes, if the works are in other rooms. The site is then split into sections and the cleaned areas are closed off so they don’t get dirty again. If fit-out continues in the same area, the rough stage waits until it finishes — otherwise the work gets done twice.
We are. Before starting we record the condition of the finishes, we use products matched to the specific material, and liability is covered by insurance. Delicate surfaces — fresh lacquer, soft stone, painted panels — are tested on a inconspicuous area and the method is agreed with you.
Strip-out, putting right construction defects, skip removal, industrial duct cleaning and high-access facade work. All of it is priced separately and agreed in advance.
Let us price your site
Send us the area, the state of the site and the date the works finish — we’ll come back with a method statement and a quotation. The survey is free.